Category

Infrastructure

Work


INFRASTRUCTURAL INTERVENTIONS WITH ARRANGEMENT OF GREEN AREAS AND CONSTRUCTION OF TRAM AND BRT - REDEVELOPMENT OF EAST NAPLES 2.0

Description


The project involves the construction of New BRT Line connecting the Central Station of Piazza Garibaldi and the Hospital of the Sea - BreST (BRT Naples EST) and the extension of the tramway line from the current end of Via Stadera to the current ANM depot on Via Nazionale delle Puglie and adaptation of the same car depot to make it usable as a garage and workshop for trams.
The BRT network has a total extension of about 14km and is characterized by the concept of the green way, in which equipped green linear paths, cycle paths, lanes dedicated to public transport, dedicated stops and shelters, and a public green system will find space

Tecnosistem Activities


Technical Economic Feasibility Project -Technical coordination, safety and coordination plans, road layouts and design, structural design, underground utilities and interference, design of special systems and f.m. light, design of electric traction tram systems, design of tramway equipment, support to the contracting authority, transport investigations