Category
Infrastructure
Work
CABLEWAY SYSTEM BETWEEN SANT’AGATA SUI DUE GOLFI (MASSA LUBRENSE) – SORRENTO
Description
The project provides for the cableway connection to connect Sorrento to Sant’Agata sui due Golfi.
The designed system has a length of about 2 km and a height difference of just under 400 m.
It will be a hybrid type system,that is the traction of the vehicles can take place in two ways, on rope and on monorail by means of automatic clamping, in order to solve the complex needs of the territory. The system capacity to be over 800 passengers / hour at rush hour
Tecnosistem Activities
Technical Economic Feasibility Project - General coordination of the working group and relations with clients (ACAMIR) and Administrations, structural - functional design, accident prevention, Archeology, Environment