Tasks performed:

  • Assembly and Final testing requirements
  • Equipment Setup of Vibration test areas
  • Procedure for quality control of monitored work environments Cat. 5 (NAS 1638)
  • Procedure for oil micro particle detection to guarantee the operation of a hydraulic circuit