Project title: Design and construction of automatic Metro Line C - Rome

Start/End Date: 2006-on going

Project overview :

24 stations of the automatic metro line (15 deep underground), 11 converter substations, 14 ventilation shafts, 13 km of tunnels, 9 km of railway embankment and a terminal depot of rolling stocks covering an area of 120.000 sqm

Value of the project: 2.800 M€

Value of the work assigned to Tecnosistem:120 M€

Value of the engineering tasks assigned to Tecnosistem: 4,2 M€

Tasks performed:

  • Consulting services for functional architectural design of stations between segments T4-T5-T6A and T7
  • Consulting services on mechanical, electrical, handling and special systems

    - Preliminary and detailed Design

    - Detailed design of the modifications for T4 and T5 segments

    - Construction design of T4-T5-T6A segments

    - Construction design verification of T7 segment

  • On-site Technical support and interface between the design team and subcontractors

Client: Metro C S.c.p.A. (JV Astaldi S.p.A., Vianini S.p.A., Ansaldo STS S.p.A., Cmb Carpi s.r.l., Consorzio Cooperative Costruzioni)